Controlled drawing
Latest revision with dimensions, tolerances, datums, interfaces, material/finish callouts and applicable notes.
Drawing-based project route
Use a current drawing, sample-information package or measured interfaces to define the structure, review boundaries, approval evidence and commercial scope.
01 / Input package
The starting package should identify the controlled source and what must be returned for approval.
Latest revision with dimensions, tolerances, datums, interfaces, material/finish callouts and applicable notes.
Sample identity plus a measurement and approval plan. A physical sample does not replace missing application requirements.
Equipment envelope, shaft/bearing/mounting interfaces, operating conditions and the engineering decision still required.
02 / Project sequence
Timing is confirmed after scope and approval requirements are known.
Record drawing revision, sample identity, application and expected quantities.
List missing specifications, manufacturability issues and commercial assumptions.
State product, process, documents, packaging, exclusions and quotation basis.
Agree sample, dimensional record, drawing sign-off or other release method.
Use the approved input and change-control route for production and delivery.
03 / Specification boundary
The planning file mentions several material families, but the provided evidence does not verify a blanket supply range. The site therefore asks for the governing requirement instead of publishing an unsupported capability list.
MaterialGrade, standard, condition and required evidence.
GeometryDatums, critical characteristics and interfaces.
SurfaceFinish, coating, protected areas and appearance criteria.
RecordsSampling, report format, certificates and approval signatures.
ARCHIVE / CUSTOM MACHINING04 / Public evidence
The archive shows machining on housing structures. It does not publish the customer drawing, material certificate, tolerance values, measured results or field performance.
Use the web form for non-confidential PDFs or images. Send CAD files through an agreed channel after first contact, and identify any confidentiality, file-access or retention requirement before transfer.
See the anonymized project archive ↗05 / Start the project review
Include what you want Runfeng to confirm or return—not only the file itself.